"The United States transportation system is the envy of the world." - Jerry Costello

Maintenance Division - Snow Removal

 

Maintenance Crews| No Parking Signs | Sidewalk Maintenance | Snow Removal
Street Rating | Tree Trimming | Utilities

To report a street that is snow/ice covered click here.

Image of Park in Ice

 

LEAWOOD PUBLIC WORKS DEPARTMENT
SNOW AND ICE REMOVAL POLICY

The SNOW AND ICE REMOVAL POLICY is intended to keep vehicular traffic moving at a safe and constant speed. In order to accomplish this, the City is divided into ten (10) districts. Each district has three (3) priorities for snow and ice removal:

  • FIRST PRIORITY: Arterial roadways. Arterials are heavily traveled north- south, east-west, cross city routes and thoroughfares, (e.g. 95th Street, 119th Street, Mission Road). These streets are maintained at all times by continuous plowing and applying deicing material until these roads are cleared of snow and the snow has stopped.

  • SECOND PRIORITY: Collector streets. Collector streets in residential areas provide primary access to arterial streets, (e.g. Manor Road, 105th Street, 121st Street). Snow removal on streets in this classification begin once the snow has stopped or all First Priority Streets have been cleared. These streets are plowed along with applying deicing material until cleared of snow.

  • THIRD PRIORITY: Local residential streets. Snow removal on streets in this classification begins once the First and Second Priority Streets are cleared. Generally plowing of Third Priority Streets begins shortly after the snow event ends. These streets are plowed along with applying deicing material until the snow is cleared.

  • HOT SPOTS: Throughout the storm, known trouble locations, "hot spots" (steep intersections, hills and bridges) are continually plowed and treated with deicing material during the snow storm.

All snow is plowed to the side of the street. The City does not remove snow from in front of driveways or sidewalks. The removal of snow on sidewalks is the responsibility of the abutting property owner.

The City has recently established two different priorities for clearing streets:

  • Snow events with forecasts predicting four inches of snow or less are staffed with 13 Public Works vehicles equipped for snow removal. Snow removal operations run 24-hours a day utilizing two 12-hours shifts until all streets are cleared.

  • Snow events with forecasts predicting over four inches of snow are staffed with 18 vehicles equipped for snow removal. Both Public Works and Parks Maintenance equipment are used for these events. Snow removal operations run 24-hours a day utilizing two 12-hours shifts until all streets are cleared.

Vehicle Maintenance Personnel are called in on a 24-hour basis utilizing two 12-hour shifts during snow removal operations to perform vehicle maintenance and repairs.

This year, the Leawood Public Works Department will utilize GPS technology, Automated Vehicle Locators (AVL) in all snow removal equipment. This added technology will track the location of all vehicles including speed, direction, whether a plow is up or down, and rate of material application. The data will be overlaid on a City map showing where the trucks have been, direction they are going, streets that have been plowed, and streets that need plowing. This technology will allow management to monitor the operation in real time improving response time and eliminate streets from being missed before a truck leaves its area.

These changes are being implemented to enhance the City's response time to clear all streets of snow. The Current Policy and Goal is to have all streets cleared within 24-HOURS OF THE SNOW EVENT ENDING.

 

WHAT YOU CAN DO TO HELP SNOW REMOVAL OPERATIONS

  • 1. Parking off the street during inclement weather.

    Car Snowed UnderIf street parking is absolutely necessary, do not park directly across from another parked car. Visibility is poor during snow removal and the trucks are large and need room to maneuver. Please give the trucks plenty of room.

    2. Trimming low hanging branches from right-of-way trees.

    Trees with IceTrees located close to the street must have their branches trimmed a minimum of fourteen feet above the pavement at the curb line. In the past, snow removal trucks have been damaged by low hanging limbs, resulting in equipment down time and a slower snow removal program.

    3. Clearing the sidewalk in front of your home or business.

    Sidewalk and Snow Man shoveling Sidewalk

    SNOW AND ICE TO BE REMOVED FROM SIDEWALKS

    It is the duty of the property owner and/or occupant of any lot(s) abutting upon any sidewalks to clear all snow and ice within 48-hours of a snow event ending.

    4. Not allowing children to construct snow structures or sled in the right-of-way.

    Snow plow trucks move several tons of snow off the pavement. It is extremely dangerous to allow children to play near the road during snow removal. Truck drivers cannot always see children playing and the weight and force of moving snow could cause serious injury.

    Children playing in snow

Snow Route Maps

Snow Route 1 - Somerset to 95th, Mission Rd to State Line Rd
Snow Route 2 - 95th to Lee, south to I-435, Mission to State Line Rd
Snow Route 3 - College Blvd. to 119th, Nall to State Line Rd
Snow Route 4 - 119th to 127th, Mission Rd to State Line Rd
Snow Route 5 - 119th to 131st, Roe to Mission Rd
Snow Route 6 - 119th to 135th, Nall to Roe / Mission Rd
Snow Route 7 - 123rd to 135th, Mission to State Line Rd
Snow Route 8 - 135th to 143rd, Mission to State Line Rd / east boundary
Snow Route 9 - 143rd to 151st, Nall to Kenneth Rd
Snow Route 10 - 151st to south boundary, Nall to east boundary
Tandem North
Tandem South


Subdivisions with Private Streets [128.5 KB]

State Line Road Snow Removal [101.28 KB]

 

City of Leawood